Planning V2: Display of Utilization/Capacity Directly in Planning & Series Entry of Holidays

On the way to going online for everyone, the Early Birds have been benefiting from the following two new development steps since today:

Series Entry of Holidays

With the series entry under "Absences" at the top right (1), holidays can be entered for all persons at once - as accustomed from the old planning.

Projekt-Planung  Auslastung KapazitätEnglish image not yet available...

Display of Available Capacities or Excessive Utilization

Each week, the utilization on Friday is tangible as a number:
If the employee is between 80 and 120% utilized, this is considered well planned and the number is only displayed on mouseover (2). If the utilization is below 80% or above 120%, the number is displayed directly as a hint (3).

The number changes live while planning.

Orange number Number of hours over-planned
Gray number Number of hours still plannable

The basis here is always the set Target-Actual hours through the weekly model and the entered absences.

If no hours are displayed, the person does not have a weekly model (e.g., external or not specified).